Blake Road and Coors Boulevard Improvements

The project consists of roadway improvements at the Blake Road and Coors Boulevard intersection and storm drain improvements that will capture runoff at the intersection and will connect to the Isleta Drain.

Roadway improvements shall consist of the widening of Blake Road to include dedicated bicycle lanes, curb and gutter, and sidewalk to improve safety and capacity of the roadway corridor.

At the intersection of Blake Road and Coors Boulevard dedicated turn lanes will be added to improve traffic flow through the intersection.

The new storm drainage system will connect to the existing storm drain pipes along Blake Road just west of Coors Boulevard. The storm drain pipes will extend to, and discharge into the Isleta Drain to improve drainage through the area and reduce flooding.

Construction Exhibits

Exhibit 1 - Construction Phase Map (Phases 1 through 5)

Exhibit 2 - Construction Phase Map (Phase 6)

Exhibit 3 - Detour Map (Phases 2 through 5)

General Project Information

Status | Construction
Project Engineer | Brian J. Lopez, P.E.
Design Consultant | Souder Miller and & Associates
Design NTP | 09/10/2015
Construction NTP | 01/16/2018
Estimated Construction Cost | $4,666,770.00
Construction Completed | January 2019