✖ Close Social Content

To navigate these projects, please refer to the organizing tabs located below, on the right side of the page.

For a list of current projects, click here. 


All Posts > District 1

Finished Projects District 1

An adaptive signal control system is a designated set of traffic signals that effectively communicate with each other to improve overall traffic flow along a respective corridor. The traffic signals adapt to the traffic flow, reducing the frequency o... Read More


District 2 District 1

Project Scope

Construction of this project includes: pulverizing existing pavement and repaving with new pavement section; Install infiltrators parallel to the road where drainage issues are found on Ranchitos Road; placing new paving section on Calle... Read More


Finished Projects District 1

Scope

The existing Edith Blvd asphalt surface was milled and a new asphalt surface placed between Montano Road and Osuna Road. Damaged sidewalk segments were reconstructed.

The existing Vineyard Road asphalt, between Second Street and Ro... Read More


District 2 District 4 Finished Projects District 1 District 5 District 3

Project Scope

Fiber OpticsBernalillo County is installing thousands of feet of fiber-optic cable to establish its own infrastructure for voice and data communications.  The fiber-optic cable provides a greater bandwidth to carry digital information. Ind... Read More


Finished Projects District 1

Certificate of Occupancy has been issued Interior of the library has had it's final cleaning by the restoration company Vinyl composition tile (VCT) has been stripped and waxed All Williamson Restoration equipment has been removed from the j... Read More


Powered by Real Time Solutions - Website Design & Document Management